AutoCAD Shop Drawings for A Fire Fighting Project DWG

AutoCAD Shop Drawings for A Fire Fighting Project DWG


Download AutoCAD Shop Drawings for A Fire Fighting Project DWG. final working drawings for a firefighting project.

 Download Also: Firefighting Project Shop Drawings

AutoCAD Shop Drawings for A Fire Fighting Project DWG
AutoCAD Shop Drawings for A Fire Fighting

AutoCAD Shop Drawings for A Fire Fighting Project DWG
  • This Drawing Shall Be Read In Conjunction With The Other Mechanical Services Drawings, Electrical Architectural.
  • All Dimensions Are In Millimeter Unless Otherwise Noted.
  • Fire Fighting Pipes Shall Be Black Steel Sch 40 As Pes Astm A53, Under Ground Pipes Shall Be Cpvc Sch 80 With Thrust Blocks As Per Nfpa.


  • Hydrotest All Fire Water Piping System To 150% Of The Working Pressure.
  • Sprinkler Locations Given, Are Subject To Changes Exact Location And Of Sprinkler To Be Determined During Shop Drawing & Final Reflected Ceiling And In Coordination With Other Provisions (Ductwork, Light Fixtures... Etc)
  • The Installation And Testing Procedure Of The Fire Fighting Systems In This Drawing Shall Be In Accordance With Nfpa Latest Edition.
  • The Piping Network Shall Be Installed So That The System May Be Drained.
  • All Pipes Pass Thru Wall Or Slab Shall Be Thru Pipe Sleeves.
  • All Exposed Pipes Shall Be Properly Insulated According To Specified Insulating Material.
  • All Pipe Sizes Are In Millimeter And Are For Internal Diameter Of Pipe.
  • The Pumps Motor Size To Be Verified And Adjusted If Necessary By Contractor Upon Final Selection Of Equipment, And Completion Of Shop Drawings.
  • Provide Expansion Loop/ Connection Where Necessary.
  • All Fire Fighting Pipes Shall Be Grounded Fire Hose Cabinet Drop Lines Location Shall Be Coordinated With Other Services At Site.
  • The Pipelines Should Be Supported In Proper Intervals To Avoid Stresses In The Pipelines.
  • All Embedded Pipelines Must Pass The Required Test Before Closing The Trench Or Wall.
  • All Fire Fighting Pipes Shall Be Paint With Two Layer Of Epoxy And One Layer Of Fire Fighting Pipes Red Color 
  • All Supports And Hangers To Be In Accordance With Nfpa 13.
  • Sprinklers In Public And Common Areas With Finished Ceilings 
  • Rooms Shall Be Fully Recessed, Concealed Type With Factory Finished Cover Plates As Directed By Architect.

Download AutoCAD Shop Drawings for A Fire Fighting Project DWG 

Post a Comment

0 Comments